Natural Gas

Project Profile

  • Natural Gas Construction

    • Overview

      Natural Gas System Upgrades

      Sometimes you will see us in your neighbourhood or within the Transportation Utility Corridor (TUC) completing work to upgrade the natural gas system. This work can be messy and kind of loud, but once we are done we will put things back the way found them.

      When we are working in your area it could be part of our Steel Mains Replacement (SMR) project in Edmonton and Calgary, our Plastic Mains Replacement (PMR) project in rural areas, or sometimes we are helping other major projects and moving our lines out of the way. If by chance you do see us working near the ring road (also known as the TUC), we are likely out doing some work on the Urban Pipeline Replacement (UPR) Program.

      In most cases if you see our workers or contractors they are probably replacing old distribution lines with new pipelines for continued safe and reliable service for you the customer.

      How does this affect you?

      If you are going to be impacted by one of our projects, you will be contacted before any work takes place on your property by mail or by phone. ATCO representatives will meet with you to discuss specific impacts. To ensure you have proper notice of the work that will take place ATCO will notify all impacted homeowners prior to any construction activity or service interruptions.

      A few things that may happen if we are doing construction near your home or business:

      • Potential lane, road, alley or pathway closures
      • Increased traffic and construction noise
      • Excavation on your property near the gas meter and along boulevard to connect homes to the natural gas system
      • Temporary interruptions to your service, this will be arranged in advance with all residents
      • Increase in dust from construction

      To help ensure public safety, all our excavations that are open and accessible to the public will be supervised or fenced. We still ask that you please be aware of hazards and avoid excavation sites — especially keeping children and pets at a safe distance.

      If you have any questions

    • Calgary

      The projects listed below are active or soon to be active and will have direct impacts on customers. We will update this page as projects are about to start or when changes are required. 

      Northwest Calgary Connector

       

      Construction Timeline: October 2021

      Location: Along NW section of Stony Trail (in the TUC), then North along 85 Street NW from Scenic Bow Road to Township Road 261A

      Project: UPR

      Phase: Construction

      Calgary Downtown - 6 Avenue and 4 Street SW

       

      Construction Timeline: Summer - Fall 2022

      Location: 5 to 6 Avenue SW and 2 to 4 Street SW

      Project: SMR

      Phase: Planning

    • Edmonton

      The projects listed below are active or soon to be active and will have direct impacts on customers. We will update this page as projects are about to start or when changes are required. 

      Braeside

       

      Construction Timeline: Q2 2024

      Location: St. Albert Trail to Bishop St, Sturgeon Rd to Belmont Dr

      Project: SMR

      Phase: Construction

      Dunluce Phase 1

       

      Construction Timeline: Q3/Q4 2024

      Location: 162 Ave to 167 Ave, Dunluce Rd to Castle Downs Rd

      Project: SMR

      Phase: Planning

      Meyokumin

       

      Construction Timeline: Q2 2024

      Location: 66 St and 62 St, 17 Ave and 20 Ave

      Project: ARP/SMR

      Phase: Completed

      Allendale

       

      Construction Timeline: Q2/Q3 2024

      Location: 109 St and 104 St, 66 Ave and 61 Ave

      Project: SMR

      Phase: Planning

      Strathearn

       

      Construction Timeline: Q2/Q3 2024

      Location: 95 Ave to Strathearn Cres and Connors Rd to 92 Ave

      Project: SMR

      Phase: Construction

      Beverly Heights Phase 2

       

      Construction Timeline: Q2/Q3 2024

      Location: 50 St and 38 St, 114 Ave and 108 Ave

      Project: SMR

      Phase: Completed

      Kilkenny

       

      Construction Timeline: Q2 2024

      Location: 147 Ave to 149A Ave, 75A St to 73 St  

      Project: SMR

      Phase: Construction

      Glenwood East

       

      Construction Timeline: Q3/Q4 2024

      Location: 95 Ave to Stony Plain Rd, 163 St to 156 St

      Project: SMR

      Phase: Planning

    • Other

      We will update this page as projects are about to start or when changes are required.